CNI Europe has the right equipment to deliver results quickly. Line of site surveys can be done with only minutes spent at each location, an important factor when considering traffic disruption and the safety of personnel. In a single day we have surveyed 23 separate locations for a complex radio network. All of our access equipment gives us a working height of 12 metres, satisfying 98% of installation requirements. Our relationships with rental companies give us fast access to mobile 26 metre equipment when needed, still on a single operator basis. Anything higher requires a specialist vehicle with operator as well as our own engineer, and is usually available at 48 hours notice.